banner
Technical Services Van Fleet

Projects Undertaken

Birley Group / Caprice Holdings

Ivy Restaurant – approx. 1991 after a major refurbishment by others, Technical Services were appointed to resolve Kitchen refrigeration, extract ventilation, supply ventilation and air conditioning.

Annabel's Night Club – approx. 1992 Technical Services were appointed the Design & Build Contract for the Kitchen Refrigeration, extract ventilation, supply ventilation and air conditioning.

Le Caprice –Technical Services were appointed the Design & Build Contract for the Kitchen Refrigeration, extract ventilation, supply ventilation and air conditioning. Following which front of house ventilation and air conditioning refit undertaken.

George Restaurant –Technical Services were appointed the Design & Build Contract for the Kitchen and front of house Refrigeration, heating ventilation and air conditioning.

J Sheekeys  – Technical Services were appointed for a number of separately staged Design & Build extension and refit works Contracts for the Kitchens and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

Scott’s restaurant –Technical Services were appointed the Design & Build Contract for the Kitchen and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Of particular note was our installation of open loop borehole cooling system.

The Ivy Club Restaurant –Technical Services were appointed Design & Build Contract for the Office conversion refit over 3 floors of Kitchens and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

Harrys Bar –Technical Services were appointed the Design & Build Contract for the Kitchen and front of house Refrigeration, ventilation and air conditioning. Of particular note was our acoustic design to meet the stringent noise control requirements together with undertaking of brick built riser enclosure of kitchen extract ductwork to meet Planning requirements.

Mount Street Deli - Technical Services were appointed Design & Build Contract for the conversion refit over 2 floors of Kitchen and shop / dining Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

34 Grosvenor Square - Technical Services were appointed Design & Build Contract for the conversion refit over 3 floors of Kitchens, private dining and front of house dining Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Of particular note was our involvement in representing the Client as expert witness in response to Queens Council questioning with regards submission to Westminster Council for low level Kitchen exhaust incorporating Ecology unit filtration and odour control. Working with Martin Brunidski Design Studio.

Balthazar Covent Garden - Technical Services were appointed Design & Build Contract for the conversion refit over 2 floors of Kitchens, private dining and front of house dining Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Works included the incorporation of an adjacent shop unit and its conversion to basement staff facilities and ground floor Bakery retail outlet. Of particular note was our early stages involvement in assisting Landlord and Client in achieving Planning consent for suitable external Plant space to ensure unit could be adequately serviced for a Restaurant together with borehole option modelling report production.

Balthazar off site Bakery at Hercules Road - Technical Services were appointed Design & Build Contract for the fit out of 2 railway arches for Balthazar specialist Bakery operations Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

Casinos

Clermont Club Casino and Club  – Technical Services were appointed for a number of Design & Build extension and refit works Contracts for the Kitchens and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

Maxims Casino - Technical Services were appointed Design & Build Contract for the Kitchens and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage.

Grosvenor Casinos – varied works across property portfolio.

Other Restaurant & Chains

Slug and Lettuce - roll out of 20 units for the Kitchen and front of house Refrigeration, heating ventilation and air conditioning.

Mossimans and Belfry Club

Le Bouchon Spitalfields - Technical Services were appointed Design & Build Contract for the Kitchen and front of house Refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Of particular note was the requirement to meet stringent Landlord development performance specification for Kitchen exhaust treatment and noise attenuation.

Hix Tramshed - Technical Services were appointed Design & Build Contract for the Kitchen front of house, and basement gallery heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Of particular note was the requirement to meet stringent Planning conditions specification for Kitchen exhaust treatment and noise attenuation.

Brindisa - Technical Services were appointed Design & Build Contract for the Kitchen front of house, and basement gallery refrigeration, heating ventilation and air conditioning, together with domestic hot and cold water and above ground drainage. Of particular note was the requirement to meet stringent Planning conditions specification for Kitchen exhaust treatment and noise attenuation.

Residential

Ibstone Farm – Lady Getty’s Oxfordshire Residence. Technical Services were appointed for the correcting and enabling works for a previous centralised estate heating and hot water system together with new air conditioning to living areas and guest buildings. Of particular note was our design and installation of a new generator system to overcome infrastructure power cut issues.

2 Spencer Park – Sir Robert Malpas’ Residence. Technical Services were appointed for the air conditioning and ventilation of new structural glass garden building extension.

Office and Institutions

Chatham House Casino - Technical Services were appointed for the Design & Build for the Basement auditoria heating ventilation and air conditioning refit.

Oxford Campus –Technical Services were appointed the Design & Build sub Contract for refrigeration and general mechanical services for refit program of works.

Retail

OKA Retail and office fit out works at Milton Park and Fulham Road.

General

We have been specifically recommended by the local Authority for the design of new Kitchen exhaust and external Plant acoustic treatment to ensure Planning conditions are satisfactorily met. An example of which was Semplice Restaurant Woodstock Street.

We are British Airport Authority approved for working landside and air side, examples of which were Ponti’s restaurants Heathrow and Stansted.

Maintenance and refurbishment design and build contracts for MECCA Bingo Halls and Grosvenor Casinos.

Local Authority works.